Analysis Of Labor Productivity In Ironwork Floor Plate For Main Substation Construction Project For Cable Lines High Voltage At BKMS – JIIPE

Authors

  • Mohammad Andi N TEKNIK SIPIL UNIVERSITAS ISLAM DARUL 'ULUM LAMONGAN Author
  • Intan Mayasari Author
  • Ibnu Toto Husodo Program Studi Teknik Sipil, Fakultas Teknik dan Informatika, Universitas PGRI Semarang Jl. Sidodadi Timur No. 24, Karangtempel, Semarang Timur District, Semarang City, Central Java 50232 Author
  • Izza Faila Sufa Department of Civil Engineering, Faculty of Science and Technology, University Islamic of Nahdlatul Ulama, No. 09 Taman Siswa Street, Pekeng, Tahunan, Jepara, 59427, Indonesia Author

Keywords:

Productivity, Labor, Floor Plates, Work Sampling

Abstract

Productivity is an important factor in carrying out construction work. The level of labor productivity is directly proportional to the amount of work that can be completed; the higher the productivity, the faster the work can be completed. In floor slab installation work that has a large volume and requires a lot of labor, optimizing productivity is an important step to reduce costs and implementation time in order to obtain maximum results. This study uses the Work Sampling method through direct observation in the field to obtain data on labor, time, and work volume in the floor slab reinforcement installation process. Data collection was carried out during normal working hours at 08.00–16.00 with a break time at 12.00–13.00, without involving overtime. The data obtained were then processed to calculate labor productivity and compared with the standards set out in PUPR Ministerial Regulation No. 8 of 2023. The results showed that the average productivity in the field for reinforcement work reached 687.637 kg/OH, while the productivity value based on the analysis according to PUPR Ministerial Regulation No. 8 of 2023 is 400 kg/OH. The comparison shows that the average productivity in the field is 1.719 times higher than the applicable standard.

References

[1] V. S. Diana, “Perbandingan Produktivitas Pekerja Di Lapangan Dengan Permen Pupr 2022 Pada Proyek Guest House Exindo 57 Kabupaten Nganjuk,” Vol. 19, Pp. 26–34, 2022.

[2] B. R. Karima, M. Khamim, And J. Setiono, “Proyek Apartemen Bess Mansion,” Vol. 1, No. September, Pp. 19–25, 2020.

[3] P. Proyek, G. Dokpol, R. S. Bhayangkara, B. A. Mulingka, F. P. Y. Sumanti, And J. Tjakra, “Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Plat Lantai Bondek,” Vol. 21, No. 85, 2023.

[4] J. Kacapuri, J. Keilmuan, And T. Sipil, “Universitas 17 Agustus 1945 Surabaya (Teknik Sipil, Fakultas Teknik) E-Mail:,” Vol. 5, Pp. 260–268, 2022.

[5] A. R. Noorfauzi And M. R. Hidayat, “Pengaruh Keahlian Dan Pengalaman Kerja Terhadap Produktivitas Tukang Konstruksi : Suatu Tinjauan Naratif,” Vol. 4, No. 2, Pp. 124–134, 2026.

[6] P. T. Dan, A. A. Muti, A. F. Adi, M. Rahayu, And E. Indriastiningsih, Pengantar Teknik Dan Manajemen Industri.

[7] M. Khoirunnizam And A. Setiawan, “Pelaksanaan Proyek Rehabilitasi Jembatan Beton Penghubung Nglinggo — Kepohbaru,” Vol. 02, No. 02, Pp. 125–143.

[8] P. Study, S. Fakultas, T. Universitas, I. Darul, U. Lamongan, And M. Pelaksanaan, “Metode Pelaksanaan Pekerjaan Kontruksi Kolom Dalam Proyek Pembangunan Masjid-Bkms Jiipe Gresik,” vol. 04, no. 02, pp. 58–71, 2024.

Downloads

Published

2026-05-24